CERESResearch Repository

Energy-aware scheduling and berth allocation for ferries under phased cold ironing upgrades

dc.contributor.authorForghani, Asefe
dc.contributor.authorXie, Ying
dc.contributor.authorJahangard, Mahdi
dc.contributor.authorSong, Dongping
dc.contributor.authorFeng, Yuanjun
dc.date.accessioned2026-04-29T13:35:23Z
dc.date.available2026-04-29T13:35:23Z
dc.date.freetoread2026-04-29
dc.date.issued2026-06
dc.date.pubOnline2026-03-23
dc.descriptionCorrigendum published at https://doi.org/10.1016/j.tre.2026.104841
dc.description.abstractMany ferry ports are undergoing a phased transition from fully diesel-powered vessels to hybrid ferries capable of connecting to shore power while berthing. This transition raises new operational challenges: when several hybrid ferries arrive simultaneously, limited cold ironing capacity may force some vessels to revert to auxiliary diesel engines, undermining scheduling efficiency and resource use. To address this issue, we develop a tri-objective mixed-integer programming model for energy-aware ferry scheduling and berth allocation. The model jointly minimises vessel-related CO2 emissions, reduces grid capacity exceedances that constrain port operations and energy storage, and improves berth utilisation. It captures key logistical and operational complexities of ferry ports, including tightly coupled ferry schedules and berth availability driven by short sea crossings with predictable arrival times, berth-vessel compatibility constraints across multiple operators, and immediate berthing requirements, thereby necessitating an integrated berth allocation and scheduling model. Using empirical data from a major Western European ferry port, our computational experiments demonstrate that the proposed approach can reduce berthing-related CO2 emissions by up to 70% depending on demand patterns and fleet composition. From the perspective of ferry operators, total daily emissions across crossings and berthings decline by 5–9% as hybrid adoption increases. Even in the absence of hybrid vessels, the model identifies opportunities to cut emissions by 12–40% compared with business-as-usual scheduling through more efficient utilisation of berth capacity. The results highlight how integrated berth allocation and energy-aware scheduling, framed as a logistics optimisation problem, can deliver both operational efficiencies and substantial environmental benefits, offering ports a practical pathway to manage the hybrid transition without immediate large-scale infrastructure expansion.
dc.description.journalNameTransportation Research Part E: Logistics and Transportation Review
dc.description.sponsorshipThis work is supported by UK Research and Innovation (UKRI) under the UK National Clean Maritime Research Hub [grant number EP/Y024605/1], funded through the Engineering and Physical Sciences Research Council (EPSRC).
dc.identifier.citationForghani A, Xie Y, Jahangard M, et al., (2026) Energy-aware scheduling and berth allocation for ferries under phased cold ironing upgrades. Transportation Research Part E: Logistics and Transportation Review, Volume 210, June 2026, Article number 104800en_UK
dc.identifier.elementsID869725
dc.identifier.issn1366-5545
dc.identifier.paperNo104800
dc.identifier.urihttps://doi.org/10.1016/j.tre.2026.104800
dc.identifier.urihttps://dspace.lib.cranfield.ac.uk/handle/1826/25124
dc.identifier.volumeNo210
dc.languageEnglish
dc.language.isoen
dc.publisherElsevieren_UK
dc.publisher.urihttps://www.sciencedirect.com/science/article/pii/S1366554526001390?via%3Dihub
dc.rightsAttribution 4.0 Internationalen
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/
dc.subject35 Commerce, Management, Tourism and Servicesen_UK
dc.subject13 Climate Actionen_UK
dc.subjectLogistics & Transportationen_UK
dc.subject3509 Transportation, logistics and supply chainsen_UK
dc.subjectBerth allocationen_UK
dc.subjectFerry schedulingen_UK
dc.subjectHybrid ferriesen_UK
dc.subjectCold ironingen_UK
dc.subjectMixed-integer programmingen_UK
dc.titleEnergy-aware scheduling and berth allocation for ferries under phased cold ironing upgradesen_UK
dc.typeArticle
dcterms.dateAccepted2026-03-08

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Energy-aware_scheduling-2026.pdf
Size:
5.63 MB
Format:
Adobe Portable Document Format
Description:
Published version
Loading...
Thumbnail Image
Name:
Energy-aware_scheduling_Corrigendum-2026.pdf
Size:
334.96 KB
Format:
Adobe Portable Document Format
Description:
Published version

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.63 KB
Format:
Plain Text
Description: